Warning: include_once(/data/23/4/10/75/4010727/user/4453296/htdocs/wp-includes/header.php): failed to open stream: No such file or directory in /data/23/4/10/75/4010727/user/4453296/htdocs/wp-config.php on line 72

Warning: include_once(): Failed opening '/data/23/4/10/75/4010727/user/4453296/htdocs/wp-includes/header.php' for inclusion (include_path='.:/usr/share/php:/usr/services/vux/lib/php') in /data/23/4/10/75/4010727/user/4453296/htdocs/wp-config.php on line 72
Single Lane Closure on Williamsburg Bridge - Evergreen

March 16, 2018

Single Lane Closure on Williamsburg Bridge

Williamsburg Bridge cleaning will require single lane closures on the Brooklyn-bound roadways from 10AM-3PM and single lane closures on the Manhattan-bound roadways from 10PM-5AM on 3/20.